Raptor
Multifunctional Primary Testing System
The simplest Raptor configuration gathers a comprehensive set of resources and test functions in an ultra compact, remarkably portable 77-lb (35 kg) body: master unit, detachable touch-screen console, voltage and current measurement inputs, dual voltage / current test source, binary input, and a 3-kVA digital amplifier for a maximum 9,500 A current injection with variable frequency. A large diversity of test jobs can be accomplished, including circuit breaker and re-closer testing, ground grid integrity verification, transformer saturation analysis, burden and ratio measurement, and more.
CHARACTERISTICS
• Compact and lightweight.
• Integral wheels and handle.
• Dynamic output stabilization.
• Multi-functionality.
• Expandability.
• Convenient and efficient pass-through technique.
• Pre-configured tests
• Test & results storage, download and reporting
• Internet connection
APPLICATIONS
• Primary current injection testing.
• Relay testing.
• Current Transformer testing.
• Recloser and Sectionalizers.
• Switchgear Testing.
• Heat runs.
• Ground Grid testing.
Massive use of digital technology and innovative design turn the Raptor system into the most portable primary test set available, at a very attractive price.
The simplest Raptor configuration gathers a comprehensive set of resources and test functions in an ultra compact, remarkably portable 77-lb (35 kg) body: master unit, detachable touch-screen console, voltage and current measurement inputs, dual voltage / current test source, binary input, and a 3-kVA digital amplifier for a maximum 9,500 A current injection with variable frequency. A large diversity of test jobs can be accomplished, including circuit breaker and re-closer testing, ground grid integrity verification, transformer saturation analysis, burden and ratio measurement, and more.
For high current applications, the Raptor implements the ‘pass-through secondary’ technique, with a centered hole that confers to this product a unique personality. You only need to drive the current conductor through the Raptor and attach both ends to the device under test. Multiple cables can be used in parallel to increase the effective cross section, and the compliance voltage can be easily multiplied by just doing multiple turns around the unit. If additional power is required,5-kVA slave units can be added for up to a total 18 kVA and a maximum 15,000 A injection. These units communicate with the master Raptor via an infrared link, so no physical interconnections are required. An integrated software calculator allows determining the equipment and cabling required to attain a specific amount of current easily.
Tests requiring a moderately high AC voltage up to 2,000 V can be accomplished by adding the Raptor HV to the system. These jobs include power transformer evaluation, voltage withstand / isolation tests, and step & touch voltage measurement, among others. The Raptor HV is visually similar to the other Raptor units but lacks the characteristic center hole in the current injection models.
No matter the combination of master and optional units used, the entire Raptor system is controlled as a single device from the control console in the master unit. This small command center features a magnetic rear face and implements a comprehensive collection of pre-configured tests that can be customized and extended by the user. Custom settings and test results are permanently stored for subsequent download from a PC via a standard USB port. The Raptor console can be directly updated over the Internet via its built-in RJ-45 Ethernet® LAN connection.
The Raptor is a stabilized injection system, i.e. it will compensate small supply and load variations automatically to guarantee the test values throughout the entire job’s duration. Its compact and robust design enables the use by a single person, and its modular concept avoids the need of investing in unnecessary features or carrying equipment that you will not need.
Key Features
Max. Current Permanent: 3800 A/3 KVA
Max. Current 3 Minutes: 7500 A/3 KVA
Max. Current 3 Seconds: 9500 A/2 KVA
Compliance Voltage Range: 1.2 - 0.22 V
Automatic output regulation with digital technology
Multifunctionality for most primary injection testing
Instant combination of units by infrared
Loop-through high current technique
Flexible modularity and adaptability
Modern, robust and upgradeable technology
Smart handheld controller with touch screen
Other Products
TOR-1
Transformer Oil Express Test Kit TOR detects moisture in oil quickly and precisely – even in miniscule quantities.
Express test kits have been developed specifically to detect the amount of moisture in dielectric insulation oils, which is necessary for normal operation and timely maintenance of electric equipment. The high precision and excellent long-term stability make this testing device an ideal solution for continuous monitoring of moisture in transformer oils.
The test kit is compact, reliable, simple to operate and multifunctional; it is the best choice for moisture measurement. The device also measures such parameters as water activity (aw), temperature (t), and calculates absolute water content in ppm. The device combines everything necessary for simple and comfortable operation: two digital displays to indicate sample temperature moisture content in ppm, a detachable sample container and two buttons: power and measurement.
TOR-80
The TOR-80 unit is designed to determine the electric breakdown voltage of transformer oil and other liquid dielectrics in accordance with IEC 60156, ASTM D877, ASTM
D1816, GOST 6581. It is a fully automatic device that allows testing to be performed according to the procedures specifed in these standards, as well as user procedures specifed in the
appropriate section of the setup menu.
GUIDE PS400
The Guide PS Series high-performance thermal camera is designed to make the inspection, maintenance and troubleshooting work easier, faster and more accurate.